The grooved foiled insulation panels are then laid onto the structural floor and will fully support the finished floor on top. The underfloor heating pipe is then slotted into the pre grooved insulation panels.
A screed board or timber flooring will be required on top of the insulation panels, then your finished floor can be applied.